Albern Port - Port Gate

Structural Engineering
Steel construction
Mechanical engineering
Verification of load-bearing capacity, serviceability, and fatigue strength
Risk assessment and CE marking

The Albern Harbor Gate serves as flood protection for the harbor of the same name and is designed to keep its cargo-handling facilities free of floodwater. The harbor gate is designed as a sliding gate and is operated by an electromechanical rack-and-pinion drive mounted on the top of the gate. The submitted structural analysis of the harbor gate and its drive system has been reviewed.

Technical Details
Pressure pipeline:

Pipeline lengths: 335/375/300 m
Nominal diameter: 900/850/800 mm
Gradient: ~45°
Design pressure: 802.3 mWS

Pumping station consisting of:
- 24 storage pumps
- 4 lift pumps

Client: Hafen Wien GmbH

Client: Federal Ministry of Agriculture, Forestry, Regions, and Water Management

Type: Steel hydraulic engineering

Property location: Vienna, Austria

Project period: 2016–2022